bg_image

Electricity Regulations, 2008 (L.I. 1937)

Planning, expansion and safety criteria 11.
(1) The Utility shall plan and operate the national interconnected transmission system in a safe, reliable and transparent manner and in accordance with the provisions of the National Electricity Grid Code

(2) The Utility shall co-ordinate with asset owners for the timely and consistent expansion of the transmission system infrastructure to ensure adequate and reliable operations of the national interconnected transmission system.

Subject : Electricity transmission Utility  

Procedure to Follow


Not Avaiable

Responsible Institution
Relevant Forms to Download

Not Available

Online System
Fees/ charges

Not Avaiable