Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 101
(1) A manager shall ensure that a conveyor belt in the mine is equipped with an effective start-up warning device.
(2) The start-up warning device shall be:
(a) visible and audible,
(b) be located at suitable intervals along the conveyor belt; and
(c) have a mechanism that provides a ten-second delay between the sounding of the warning and the start-up of the conveyor belt.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....