bg_image

Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)

Regulation 101

(1) A manager shall ensure that a conveyor belt in the mine is equipped with an effective start-up warning device.
(2) The start-up warning device shall be:
(a) visible and audible,
(b) be located at suitable intervals along the conveyor belt; and
(c) have a mechanism that provides a ten-second delay between the sounding of the warning and the start-up of the conveyor belt.

Subject : Health (Mining)  

Procedure to Follow


Not Avaiable

Responsible Institution


Minerals Commission

36 Second Cantonments Cl, Accra

Online System

Link Unavailable

Fees/ charges

Not Avaiable