Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 120
(1) A manager shall, before any repairs, modifications or alterations that may affect the strength, buoyancy or stability of a dredge used in the mine are carried out,
(a) apply in writing to the Chief Inspector of Mines for approval as set out in Form Twenty in the First Schedule to carry out that work;
(b) submit to the Chief Inspector of Mines plans, specifications, drawings and design calculations which indicate the nature and extent of that work; and
(c) obtain the approval of the Chief Inspector of Mines.
(2) The Chief Inspector of Mines may request the manager to provide additional information to that provided under sub-regulation (1).
(3) The manager shall ensure that a request made under subregulation (2) is complied with within thirty days from the date of the request.
(4) Where the manager applies in accordance with this regulation, the Chief Inspector of Mines may approve the repairs, modifications or alterations on the dredge to be carried out as set out in Form Twenty-One in the First Schedule.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....