Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 243
The manager of a metallurgical treatment plant shall ensure that
(a) the complexing of cyanide or cyanide reaction products in backfill preparation are conducted in a safe and reliable manner; and
(b) the product from the backfill preparation plant used for filling worked out areas underground, and the liquids draining from the filled worked out areas under ground, do not contain higher cyanide contents than the limit values established by the Environmental Protection Agency.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....