Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 245
(1) A manager of a gold processing plant shall cause a heap leach pad to be constructed for the plant in accordance with these Regulations.
(2) The heap leach pad shall be designed and constructed in a manner that ensures that the effluent from the pad into the environment complies with the limit values established by the Environmental Protection Agency.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....