Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 203
(1) The manager of a mine shall ensure that primary blasting does not take place in any development work in the mine unless there has been installed a pipe of not less than twenty-five millimetres in diameter capable of discharging a mixture of air and water so as to effectively sweep the face of the development end.
(2) The air and water pipe combination required to be installed in the mine in accordance with sub-regulation (1), shall be installed at a distance of not more than ten metres from the face and shall be properly maintained.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....