Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 215
The manager of a mine shall ensure that in the mine
(a) suitable and sufficient permanent lighting is provided and maintained at the following places underground if they are in regular use:
(i) each established station, landing or loading place and other similar place in vertical and inclined shafts, winzes and places where man winding is being carried out;
(ii) each main tip at which a self-propelled vehicle operates and each place where a self-propelled vehicle is maintained;
(iii) each main substation or substation; and
(iv) each main crusher station and each main conveyor drive unit; and
(b) in places where there is winding, driving, permanent pumping or where other machinery, lighting is provided in a manner that ensures that while the machinery is in motion the moving part of the machinery can be clearly distinguished.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....