Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 334
The engineering manager of a mine shall ensure that each steam boiler is provided with
(a) a means of attaching a test pressure gauge, and
(b) a suitable fusible plug or an efficient low-water alarm device.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....