Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)
Regulation 395
(1) The manager of a mine shall ensure that the approval of the Chief Inspection is obtained for the installation of a winding system, or for the transportation of persons or materials, in the mine or for a major modification of the winding system.
(2) Despite subsection (1) approval is not required for the installation of hoists to be used for
(a) winze sinking;
(b) raising;
(c) stope servicing; or
(d) any similar purpose.
(3) The manager of a mine shall, for the purpose of obtaining the approval referred to in sub-regulation (1), submit to the Chief Inspector of Mines
(a) plans showing the layout of the system;
(b) any information that is necessary to demonstrate that the system will comply with the requirements of these Regulations; and
(c) any other information required by the Chief Inspector of Mines.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....