bg_image

Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)

Regulation 397

(1) Subject to sub-regulation (3), the manager of a mine shall ensure that the Chief Inspector of Mines is notified of any intention to carry out repair, modification or alteration to a main structure, safety device or other safeguard of a winding engine in the mine and that the notice is accompanied by a description of the work proposed to be undertaken.
(2) A notice under sub-regulation (1) shall, as far as practicable, be given
(a) not less than fourteen days before the commencement of the relevant work, and
(b) where the period specified in paragraph (a) is not practicable, as soon as the need to undertake the work becomes apparent.
(3) Where sub-regulation (1) cannot be complied with because of the need to undertake emergency repairs or modifications, the manager of the mine shall give notice to the Chief Inspector as soon as possible after the emergency repairs or modifications have been undertaken.

Subject : Health (Mining)  

Procedure to Follow


Not Avaiable

Responsible Institution


Minerals Commission

36 Second Cantonments Cl, Accra

Online System

Link Unavailable

Fees/ charges

Not Avaiable