bg_image

Drilling Licence and Groundwater Development Regulations, 2006 (L.I. 1827)

Regulation 14—Collection of drilling cuttings 
 A drilling contractor shall collect samples of drilling cuttings at one-metre intervals and in the event of a sudden change in rate of penetration or lithology during drilling.

Subject : Water & Sanitation  

Procedure to Follow


Not Avaiable

Responsible Institution
Relevant Forms to Download

Not Available

Online System

Link Unavailable

Fees/ charges

Not Avaiable