bg_image

Petroleum Commission (Fees And Charges) Regulations, 2015

Regulation  4: (l) A subcontractor, licensee or other person that is not registered with the Commission but intends to bid for a contract shall, before submitting a bid for the contract,
(a)        apply to the Commission for a Bidding Permit; and
(b)        pay in respect of the Bidding Permit, the fee specified in Part 7 of the Second Schedule.
(2)        A permit issued under subregulation (1) is valid for a period of three months.

Subject : Fees and Charges (Petroleum)  

Procedure to Follow


Not Avaiable

Responsible Institution


National Petroleum Authority

No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra

Relevant Forms to Download

Not Available

Online System

Link Unavailable

Fees/ charges

Not Avaiable