bg_image

Petroleum Commission (Fees And Charges) Regulations, 2015

Regulation 9: (1) A person issued with a permit under these Regulations other than a Bidding Permit may apply to the Commission for a renewal of the permit.
(2)        An application under subregulation (1) shall be made not less than one month before the expiration of the permit and upon payment of the fee specified in the appropriate Schedule.

Subject : Fees and Charges (Petroleum)  

Procedure to Follow


Not Avaiable

Responsible Institution


National Petroleum Authority

No.6 George Walker Bush Highway Adjacent Petroleum Commission Dzorwulu, Accra

Relevant Forms to Download

Not Available

Online System

Link Unavailable

Fees/ charges

Not Avaiable