• Regulation 5—Requirement to comply with standards
    (1) A person shall not commence the construction of a pipeline unless that pipeline has been designed in accordance with the requirements of these Regulations.
    (2) A person shall not replace or relocate a segment of a pipeline unless it has been
    (a) designed,
    (b) tested,
    (c) installed, and
    (d) inspected
    in accordance with the requirements of these Regulations.

    Subject : Gas Pipeline Safety  
  • Procedure to Follow

    Not Avaiable

  • Responsible Institution


    Ministry of Energy

    Ministries Enclave Accra, Ghana Opposite Pension House, SSNIT
    Email: info@energymin.gov.gh
    Website: www.energymin.gov.gh
    GPS:
    Tel: +233 302683961 – 3

  • Relevant Forms to Download


    Not Available

  • Online System


    Link Unavailable

  • Fees / Charges


    Not Avaiable