West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

2. PURPOSE OF REGULATIONS 2.1 These Regulations are adopted following agreement in accordance with the International Project Agreement by the Republic of Ghana ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

3. PERMIT TO SURVEY Grant and variation of permit to survey 3.1 Whenever a survey is required, the Company shall apply to the Authority for a permit to survey. ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

4. DESIGN, CONSTRUCTION, INSPECTION AND TESTING OF PIPELINE SYSTEM General 4.1 The design of the Pipeline System shall be: (a) such that the Pipe ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

5. OPERATION AND MAINTENANCE  Approval to Operate 5.1 The Operator shall not commence operation of the Pipeline System, or of additional faciliti ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

6. CATHODIC PROTECTION AND CORROSION CONTROL Corrosion Control Records 6.1 The Operator shall maintain records and maps/alignment drawings to show the location ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

7. PIPELINE SYSTEM PERMITS 7.1. No person shall conduct work or install facilities within the Right of Way unless that person has obtained a permit from the Ope ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

8. DANGEROUS CONDUCT General 8.1 No person shall engage in any activities in the Right of Way which constitute or might give rise to a threat to public health o ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

9. INVESTIGATION OF FAILURES General 9.1 The Operator shall establish procedures for analysing accidents and failures, including the selection of samples of the ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

9. INVESTIGATION OF FAILURES:9.1 The Operator shall establish procedures for analysing accidents and failures, including the selection of samples of the failed ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

10. DISCONTINUATION, ABANDONMENT AND RESUMPTION OF OPERATION OF PIPELINE SYSTEM 10.1 In the event that the Operator wishes to abandon, or discontinue or resume ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

13. ACCESS FOR THE AUTHORITY 13.1 Authorized officers or employees of the Authority, and agents authorized by the Authority, are authorised, upon presenting a v ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

15. HEARINGS OF THE AUTHORITY AND APPEALS Requirement for a hearing 15.1 If the Authority proposes to impose a penalty under Regulation 14, or receives a reques ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

6. MISCELLANEOUS Deemed Approval 16.1 All drawings, plans, designs and other technical documents made or prepared by the Operator in connection with the Pipelin ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

16. MISCELLANEOUS Standards 16.5 In the Regulations, all references to Standards are references to the versions of those Standards which are set out in Schedule ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

SCHEDULE 1: STANDARDS;The following versions of the Standards specified in these Regulations shall apply: Standard Subject Version; AGA Report No. 8 Compressibi ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

"SCHEDULE 2 COMPANY EVENTS OF DEFAULT IPA Clause Action or Omission 9.4(g) Failure to make payments to the Authority in contravention of Clause 9.4(g) of the In ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

SCHEDULE 3 FORM OF CERTIFICATE OF COMPLIANCE Certificate of Compliance I, [full name] of [address], being the [chief executive officer/project manager of name o ...

West African Gas Pipeline Regulations, 2005 (L.I. 1814)..

14. PENALTIES Liability to penalties 14.1 The actions that will render any person, including the Company, liable to penalties imposed under these Regulations ar ...