bg_image
Water Use Permit Application For Small Scale Mining.

Pursuant to the Water Resources Commission Act, No. 522, no person shall divert, dam, store, abstract or otherwise use water resources or construct or maintain ...

Water Use Permit Application For Small Scale Mining.

(a)        A site plan, showing the leased area for mining, and infrastructure such as treatment facilities, dams, ponds, and effluent disch ...

Water Use Permit Application For Small Scale Mining.

Where attached sheets and other technical documents are used in lieu of the space provided, indicate appropriate cross-references. Paragraphs that are not appli ...

Water Use Permit Application For Small Scale Mining.

The administrative fee covers costs for site-visits. Administrative fee of GHS 600.00 for processing application shall be paid on submission of completed applic ...

Water Use Permit Application For Small Scale Mining.

On the precondition that the application has been completed correctly, the average length of time required to decide on permits is 2 months from date of receipt ...

Water Use Permit Application For Small Scale Mining.

The applicant or his/her representative is required to be present during the site verification exercise of the project area. The applicant will be informed of a ...

Water Use Permit Application For Small Scale Mining.

i.        Consumptive Use: Using any mechanical means to withdraw water from ponds, lakes, rivers, streams, or aquifers, dams/reservoirs, et ...