Minerals and Mining (Health, Safety and Technical Regulations) L.I. 2182
Regulation 416—
(1) The manager of a mine shall, before re-capping a winding rope, complete and submit to the Chief Inspector of a mine, a Winding Rope Re-capped Form as set out in Form Forty-One of the First Schedule.
(2) The manager of a mine shall ensure that in the mine
(a) the method used for capping a winding rope
(i) has been approved by the Chief Inspector of Mines,
(ii) is of a proven design that provides a minimum factor of safety of seven when applied to the maximum static load on the capped end of the rope;
(b) a winding rope which is capped to secure the rope to a shaft conveyance or counterweight by means of a capel or socket is not used unless that capping has been made not more than six months before the date of the use of the winding rope; and
(c) a rope which has been recapped is not used on a winding engine unless on the last occasion on which it was recapped the capping was moved to a distance of not less than one hundred and fifty millimetres along the rope towards the standing end of the rope.
Procedure to Follow
Not Avaiable
Responsible Institution
36 Second Cantonments Cl, Accra
- Email:
- Website: https://www.mincom.gov.gh/
- GPS: GA-110-0371
- Telephone: 030 277 1318
Relevant Forms to Download
Not Available
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....