Ga East Municipal Assembly (Building) Bye-Law, 2016
Application
2. (a) An application for a building permit must contain or be accompanied by particulars of the following documents;
i) Evidence of title to the land to be developed,
ii) The drawings of the building to be developed signed by a licensed surveyor, a qualified architect and a structural engineer where necessary.
iii) The completed application forms with the attachments shall be submitted to Assembly after paying the requisite fee fixed by the Assembly.
Inspection of site
3. (a) On receipt of the application form, the Physical Planning and Works Departments of Assembly together with the applicant shall proceed to the site of the proposed development within one week and inspect the area earmarked for the development,
(b) Where the applicant’s building will obstruct the flow of water, drain and other elements or sit in a road or part of it and/or for any other reason, Assembly shall refuse granting the permit and notify the applicant in writing the reason(s) for the refusal.
(c) The Assembly shall monitor and ensure that such a person does not develop the proposed site.
(d) Where the Assembly is satisfied that the proposed development will not obstruct access and further satisfies all the conditions laid under the law, shall approve same and grant the building permit to the prospective developer.
Procedure to Follow
Not Avaiable
Responsible Institution
Abokobi
- Email: info@gema.gov.gh
- Website: www.gema.gov.gh
- GPS: GE-011-2678
- Telephone: 0303-2962718/0559920954(Whatsapp)
Relevant Forms to Download
Not Available
Online System
Link Unavailable
Fees/ charges
Not Avaiable

Loading. Please wait....