bg_image

Ga East Municipal Assembly (Building) Bye-Law, 2016

Consideration of factors for the grant 
5.         (a) The Assembly shall take into consideration the following factors in granting the building permit;
(i)     There are appropriate provisions for the early warning of fire; and the appropriate means of escape in case of fire;
(ii)   Faecal containment structure placement in the house;
(iii)  Waste water discharge from the house;
(iv) Drainage systems and adequate provision for toilets and baths in the house
(v) The architectural and structural designs are set and stamped by approved professional.
(b) The Assembly shall ensure that the construction of drainage systems shall substantially affect the granting of the building permit.
(c) GEMA shall ensure that no drainage system constructed by a landlord shall cause floods or/and nuisance to the neighbourhood. Where the drainage floods the area, the landlord shall rectify the situation by directing the waste water to the main drainage system provided in the area concerned.
(d) A household whose waste water passes through the surface of a road shall lay pipes with the advice and supervision of the officers of the Assembly to join the main drainage system provided in the area concerned.   

Subject : Registration of leases and tenencies  

Procedure to Follow


Not Avaiable

Responsible Institution
Relevant Forms to Download

Not Available

Online System

Link Unavailable

Fees/ charges

Not Avaiable